<About hardware>

1st batch ordered, 1st batch PCB manufacturing started.

PCB manufacturing will be completed on November 30th, and installation of electronic parts will begin.

Assembly is scheduled to begin on December 6th.

 

< About software >

We are conducting firmware inspection and debugging work.

I'm currently checking the preset patches that have arrived from the sound designers.

Sound designers have once again created some great preset patches. I will share the video taken during the checking process.

  

Future schedule

Week of December 4th: Start of assembly of 1st batch, start of inspection.

We will start shipping the items after they have been assembled and inspected.

 

We will proceed with development as fast as possible, but the schedule may change depending on the development status.

Thank you,

Yu Endo

 

今週の出来事

<ハードウェアについて>

先週1stロットを発注し、1stロットの基板製造が開始しました。

11月30日に基板製造が完了し、電子パーツの取り付けを開始します。

12月6日から組み立て開始する予定です。

 

<ソフトウェアについて>

ファームウェアの検査とデバッグ作業を実施しております。

サウンドデザイナーから到着したプリセットパッチを確認しているところです。

サウンドデザイナーの皆さんが今回も素晴らしいプリセットパッチを作成してくださいました。チェックの過程で撮影した動画をシェアします。

 

今後のスケジュール

12月4日の週 1stロットの組み立て開始、検査実施開始

組み立て、検査完了したものから順次発送開始致します。

 

なるべく最速で開発が進むように進めますが、開発状況に応じて日程に変更が生じる可能性があります。